Experienced Civil Engineering consulting firm based in Oakland, CA

Amazing clients have allowed us to produce work we are proud of.

San Jose’s Downtown West

Google’s future campus in San Jose, known as Downtown West is a $3billion+ program consisting of 7.3M sqft of office space, 4,000 housing units, and 15 acres of parks and green space.

Contributions:

  • Program management

  • Sitewide transportation strategy

  • Roadway design development

  • Bike path design

  • Rail coordination with VTA, BART to SJ, & CA High Speed Rail

  • Stakeholder management

BART

In 2016, Measure RR authorized BART to issue bonds for $3.5 billion to rebuild the aging BART system.  The overall goal of the rebuilding program is to make the system safer and more reliable and to reduce traffic.

Contributions:

  • Interlocking replacement

  • Track replacement

  • ADA upgrades at 10 BART Stations

BART to San Jose Phase II Extension - 6-mile extension of BART with four new stations along the route.

Contributions:

  • Program management

  • Track guideway design

California High Speed Rail

Construction Package 1 (CP1) is the first significant construction contract executed on California’s High-Speed Rail project. CP1 is a 32-mile stretch between Avenue 19 in Madera County to East American Avenue in Fresno County.

Contributions:

  • Track Guideway Design

  • Roadway Grade Separation Design

  • 3-D Modeling

  • Local Jurisdiction Coordination

AC Transit Bus Rapid Transit

The $230million AC Transit Bus Rapid Transit Project provides high-quality, fast, and frequent express bus service from Downtown Oakland to San Leandro BART.

Contributions:

  • Civil Design of 14.4 mile BRT alignment

  • Design for 46 station platforms, 8 miles of bike lanes, and over 500 ADA compliant curb ramps

  • 3-D Modeling

Who we’ve worked with.

We’d love to work with you too.